Modernisation of energy system support systems to reduce operating costs

As part of the project, a preliminary analysis was carried out by performing an energy audit, in terms of describing optimal parameters for the possibility of applying a cogeneration system together with modernisation of the technological system for the use of thermal energy for technological purposes.

 

Photovoltaic installation of 49.8 kWp in Chorzów, Poland

During implementation, Selfa 405W photovoltaic modules and a SMA Sunny STP 50-41 inverter were used. The panels were located on the roof of the building using a non-invasive mounting structure, facing south aiming at maximum energy production throughout the year.

PV installation of 49.8 kWp  in Limanowa

DC side fire circuit breaker photovoltaic installationsafeguard cabinet for AC and DC side, wiring and electrical testing were carried out.

Development of project documentation and installation of three PV photovoltaic installations of up to 50 kWp in Bydgoszcz

Within the framework of this task, 3 photovoltaic installations of a total power of 98 kWp have been designed and built in the standard, including management building – 40kWp, concentration plant building – 25 kWp and treatment plant building – 33 kWp.

Construction of a Photovoltaic Farm

As part of this project, from May to August 2024, work was carried out on the construction of a photovoltaic farm with a capacity of up to 250 kW, along with the necessary technical infrastructure.

 

Kontakt z nami

Pliki cookies

W celach statystycznych nasza strona używa plików cookies. Istnieje możliwość zablokowania zapisywania plików cookies poprzez zmianę ustawień przeglądarki. Jeśli nie blokujesz tych plików wyrażasz zgodę na ich użycie i zapisane w pamięci Twojego komputera. Zapraszamy do zapoznania się z naszą Polityką Prywatności.